Birmingham Children’s Hospital

Birmingham Children’s Hospital was founded in 1862 and is now considered the UK leader when it comes to specialist paediatric care. Back in 2017 it was rated as ‘Outstanding’ by CQC, and it’s recognised as a world-leading provider of come of the most complex surgical procedures, advanced treatments and medical research and development.

As a front-line provider of critical care to young people, it’s of paramount importance that the power supply is protected in all circumstances. Dunbar Wallace Fire Protection Ltd is delighted to have contributed to the safeguarding of this provision, by supplying and installing a Durasteel E240 fire and blast resistance barrier.


Dunbar Wallace Installs Durasteel Blast Resistance Barrier

Our client, Marshdale Construction, is a specialist contractor with a reputation for delivering complex construction projects within critical healthcare environments. The Birmingham Children’s Hospital project required the installation of a fire and blast resistance barrier to provide separation between transformers. In the event of a transformer blowing out, or exploding, the barrier ensures the damage is contained, minimising the risk of a chain of explosions and power outage.

 


Working With Marshdale Construction to Deliver Excellence

Dunbar Wallace uses state-of-the art technology to deliver our passive fire protection systems efficiently and safely. We began by using a point cloud laser scanning survey of the two generator buildings housing the transformers. The 3D data gathered was then used to create a parametric 3D model detailing the fabrication, location and installation of the Durasteel blast barrier.

We know that time is the most precious commodity on all construction projects. That’s why we provide our clients with an innovative approach which facilitates the off-site prefabrication of Durasteel systems. This uniquely allows for a dramatic reduction of the time that has to be spent on-site. In this case we were able to reduce it from the standard 4-5 days, down to just 4 hours.

The benefits of the DWFPL approach to fire barrier installation include:

  • Successful delivery, to deadline, of passive fire protection system
  • Reduced health and safety risk, as less time is spent on-site
  • Clean site installation
  • Minimal potential for trade clashes
  • Enhances the facilitation of programming and sequencing

Project PDF’s:

Birmingham Children’s Hospital Generator Firewall

Birmingham Children’s Hospital Generator Firewall (1)

Generator Access Platform Details


About Dunbar Wallace Fire Protection Ltd

Our specialist team design and install Durasteel passive fire protection across the UK, often working in high risk operating environments. We have designed and delivered firestopping systems in power stations, nuclear facilities, transformer substations, warehousing facilities, and railway depots. We consistently seek out innovative modes of delivery which enhance efficiency, improve health and safety, and deliver a second-to-none product for our clients.